Tuesday 16 November 2010

The Channel Tunnel

The Tunnels:

The Channel Tunnel is the longest undersea tunnel in the world. The section under the sea is 38km long. The three tunnels, each 50km long, were bored at an average 40m below the sea bed, and link Folkestone in Kent to Coquelles in Pas-de-Calais.

Eurotunnel shuttles, Eurostar and national freight trains run in the two single track and single direction tunnels. These are connected to a central service tunnel by cross-passages situated every 375m. The service tunnel allows access to maintenance and emergency rescue teams and serves as a safe haven if passengers need to be evacuated in an incident. The service tunnel is
a road tunnel used by electric and diesel-powered vehicles. Air pressure is higher in the service tunnel to prevent the ingress of smoke in case of a fire in one of the rail tunnels.


The two rail tunnels are 7.6m in diameter and 30m apart. Each rail tunnel has a single track, overhead line equipment (catenary) and two walkways (one for maintenance purposes and the other for use in the event of an emergency evacuation and on the side nearest the service tunnel). The walkways are also designed to maintain a shuttle upright and in a straight line of
travel in the unlikely event of a derailment.

Rail Control Centres:

The entire Eurotunnel transport system is controlled from the RCC (Rail Control Centre). There are two centres, one on each terminal, and each can take turns to take over control of the system. The RCC manages all rail traffic (trains and shuttles) in the tunnels and on the terminals.


The system is in two parts, the Rail Traffic Management (RTM), which controls the rail traffic system, and the Engineering Management System (EMS) which controls the fixed equipment such as ventilation, lighting, power for the catenary, etc.

Although the transport system is automated, controllers are in attendance 24 hours a day, ready to take manual control in the event of technical failure.

The Signalling System:

The signalling system in the Channel Tunnel is known as TVM 430: it functions by means of data transmission from track to train and is almost identical to the system used on the high-speed TGV Nord-Europe. Instructions and data are transmitted along the track and then to the locomotive driver by indicator lights in the cab.

All Eurotunnel trains are fitted with vigilance devices and full automatic train protection which minimises the risk of collision in the event of a human error.

After travelling through the tunnel, the through-trains operated by the railway companies then continue their journey on the UK or French rail networks, which are connected to the tunnel tracks at Dollands Moor and Frethun, respectively.

The shuttles operated by Eurotunnel remain within the Eurotunnel system: they travel on a rail loop between the Folkestone and Coquelles terminals, using the south tunnel when going from France to the UK and the north tunnel when going from the UK to France.

Service Tunnel Vehicles:

A vehicle was specifically designed for travel in the service tunnel. It is multi-functional and is used for maintenance operations and in case of incidents, with the aim of reaching the scene of an incident in minimum time.

No comments: